Well, put some of the routers up on OLSR. I haven’t finalized numbering, as you can see, but 192.168.x are linksys and 10.0.x are metrix.
February 17, 2007
Routing Routing Routing
Celes (my laptop) is connected to Kain (wirelessly)
Kain connects to Edge
Edge connects to FuSoYa
FuSoYa connects to Yang
Yang connects to Anna
Anna connects to a DSL modem (and Porom, which has a wireless link to Palom)
February 16, 2007
Wireless x 10
Metrix II
Metrix I
WRT54GL x 7
WHR54GS
one big happy network that really doesn’t like to talk to each other.
February 11, 2007
February 10, 2007
Countdown
Equipment for the March container shipment needs to be in Poulsbo by the last week in February.
February 3, 2007
Mission Complete
Well, food was served, Chili (about 5 pounds) was consumed, and 4 people ate an entire loaf of bread in 15 minutes. (Hi Ben).
T - 5 hours 25 minutes
Cheese assembly has started.
I had intended to do this yesterday… but failed to. Anyway, most of the cheese components of dinner can get made up ahead of time, so I’ve gotten various cheeses over nearly every surface here, but so far not on my sweater.
I’d attach photos, but really, nothing’s pretty at this stage of food prep.





